Summary
McMurray, P. J., and Blackburn, J., concur., Judgments affirmed in Case Nos. A95A0077 and A95A0078.
Summary
McMurray, P. J., and Blackburn, J., concur., Judgments affirmed in Case Nos. A95A0077 and A95A0078.
Text
Barnes, Browning, Tanksley & Casurella, Roy E. Barnes, Jeffrey G. Casurella, Hamil & Dickinson, R. Timothy Hamil, David L. Dickinson, for appellants.
Rice, Fitzgerald, and their wives appeal from the grant of summary judgment to Delta Air Lines, Inc. (Delta) in Rice and Fitzgerald's suits for personal injuries and their wives' derivative claims for loss of consortium.
1. "To prevail at summary judgment under OCGA
Viewing the affidavits and depositions with all inferences in favor of plaintiffs, Eiberger v. West,
Section 4.1 of the General Conditions of the contract provides that "[t]he Contractor shall supervise and direct the Work, using the Contractor's best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the contract." (Emphasis supplied.) Section 4.2 states that "[u]nless otherwise specifically provided in the Contract Documents, the Contractor shall provide and pay for all . . . equipment, tools, construction equipment and machinery, . . . necessary for the proper execution and completion of the Work, whether temporary or permanent. . . ."
Section 10.1 states that Crown "shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the Work. The Contractor shall take all reasonable precautions for the safety of, and shall provide all reasonable protection to prevent . . . injury or loss to (1) all employees on the Work. . . ."
Crown employees constructed a rolling tubular scaffolding for use on the project. The base of the scaffolding was a "farm wagon," a wagon chassis with four rubber wheels. As described by Beatty, plaintiffs' expert, the scaffolding was "side-loaded with pick boards and side mounted brackets which affected the center of gravity of the scaffold. It had one set of outriggers with screwjacks located on the side opposite of the pick boards." The scaffold was approximately five feet wide, twenty feet long, and thirty-five feet high. When the scaffolding was in use, it would be placed against the side of TOC II where the work was being conducted and the outriggers engaged so that the scaffolding was braced against the building. As opined by Beatty, "this scaffold was destined to fall given its configuration, its imbalance, and the fact that nothing was provided to assure its stability. This scaffold would have tipped or fallen whether or not it was tied to the hangar or left free standing away from the hangar. . . . [I]t was just as likely that the scaffold would have fallen with or without a gust or force of wind."
During this project, Delta continued to service airplanes in the hangar. When a plane had to be moved in or out of the hangar, Delta would request Crown to move the scaffolding if it interfered with the plane's being moved.
Sometime during Delta's evening shift at TOC II on September 18, 1991, a hangar door was being closed and damaged the scaffolding. It was not reported that evening but when Oswalt, Crown's field superintendent, arrived for work the next morning, he noticed the damage and reported it to Delta which assumed responsibility for the damage. Delta did not pay for the repairs but did offer to pay for them if Crown "felt it necessary." No request was made by Crown for payment.
The scaffold was being repaired by Crown employees over the next two days. On September 20, Hornsby, Delta's lead mechanic, asked the Crown crew to roll the scaffold away from the hangar doors so Delta could move a jet. The scaffold was rolled onto the ramp outside the hangar by Crown employees and the jet was being backed out. This was done by a mechanized cart pushing the plane from the front. The engines of the plane were not operating.
Crown was cited and fined by OSHA as a result of the accident.
2. Plaintiffs contend that the court erred in granting Delta's motion for summary judgment because, pursuant to OCGA
(a) Considering the latter first, OCGA
Plaintiffs contend that Delta is responsible because it "directed" Crown employees to perform labor without furnishing proper protection with regard to the scaffolding. Even assuming, without deciding, that a civil cause of action can be provided by violation of this penal statute, [2] the statute on its face applies only to one who directs another to work on a building or structure without a proper scaffold. Here, at the time Delta made its request that the scaffold be moved, no work was being done on the structure by Rice and Fitzgerald because of the damage to the scaffold. Work was being performed on the scaffold itself. Therefore, this statute provides no basis for Delta's liability.
(b) In order for OCGA
There was no evidence that all work on all scaffolding is inherently dangerous. The evidence put forward by plaintiffs was that this particular scaffold had been improperly constructed by Crown and was inherently dangerous. "Therefore, plaintiff[s] failed to establish that the work was dangerous 'however carefully performed.' Where the work is not inherently dangerous except as a result of the negligence of the contractor the employer is not liable. [Cit.]" Mason v. Gracey,
Working on scaffolding can be done safely, as reflected by OCGA
Therefore, summary judgment was properly granted to Delta.
3. Our decision in Division 2 makes unnecessary consideration of the remaining enumerations of error.
Dermer & Black, Stephen F. Dermer, for appellee.
1995
Notes:
1. As reflected by the portions of the contract, supra, Crown was an independent contractor regarding reskinning TOC II. Green v. Moreland,
2. But see in this regard Cox Broadcasting Corp. v. Cohn,